• Home
  • Project
    Introduction
    • Introduction
    • Background and Motivation
    • What is a Good Timetable?
    • Project Aims and Scope
  • Graph Data
    Model
    • Graph vs Relational Data Models
    • Graph Data Model for Timetabling
    • Early Insights
    • Model Expansion
    • Graphing Time
  • Data
    Pipeline
    • ETL Overview
    • Approach
    • Configuration and Logging
    • Extract
    • Transform
    • Google Drive Load
    • Neo4j Load
    • Reflection
  • Timetable
    Metrics
    • Timetable Metrics
    • Metric Aggregations
    • Implementing Metrics
    • TQI Summary
  • Final
    Thoughts
  • Appendices
    & Extras
    • Appendix Table of Contents
    • References
    • Acknowledgements
  • Word
  1. Supervision
  2. Notes Example 1
  • Home
  • Project Introduction
    • Introduction
    • Background and Motivation
    • What is a Good Timetable?
    • Project Aims and Scope
  • Graph Data Model
    • Graph vs Relational Data Models
    • Graph Data Model for Timetabling
    • Early Insights
    • Model Expansion
    • Graphing Time
  • Data Pipeline
    • ETL Overview
    • Approach
    • Configuration and Logging
    • Extract
    • Transform
    • Google Drive Load
    • Neo4j Load
    • Reflection
  • Timetable Metrics
    • Timetable Metrics
    • Metric Aggregations
    • Implementing Metrics
    • TQI Summary
  • Final Thoughts
  • Appendices
    • Random Graph Generator
    • Technology Stack
    • Configuration
    • Anonymisation
    • ETL Summary and Code
      • ETL Summary
      • ETL Code
      • Config and Misc
      • Extract-SQL
      • Extract
      • Google Drive Load
      • Transform
      • Neo4j Load
    • Neo4j & Cypher Code
      • Cypher Queries
      • Creating Nodes and Relationships
      • Deleting Nodes and Relationships
      • General Queries
      • Count Queries
      • Hard (timetabling) Constraints
      • Student Clashes
      • Soft Constraints
      • Rooms and Spaces
      • Perspectives
      • Blue Skies Opportunities
  • Supervision
    • Supervision
    • Notes Example 1
    • Notes Example 2
    • Notes Example 3
  • References
  • Acknowledgements

On this page

  • Summary
  • Accomplishments
  • Issues/Blockers
  • Next Steps
    • Weekly Goals
  • Post-Meeting Notes
  • Additional Notes
  1. Supervision
  2. Notes Example 1

Fortnightly Update - 10 June 2024

Summary

This week has been about getting back on track after an extended period away from the dissertation. It has mainly revolved around refocusing, rescoping, reacquainting and rekindling motivation.

Accomplishments

  • Results:

  • Project Management

  • Data Collection:

  • Analysis / Wrangling:

  • Model Development:

  • Investigation

Issues/Blockers

  • Technical:
    • Original servers were deleted and access to new servers was gone
    • Some original work no longer works
  • Methodological:
    • I need to ensure that scope does not creep.
    • I need to stay focused and not start solving problems which are out of scope or are interesting.
  • Data-Related:
    • develop a robust anonymisation process
    • representing time - see representing time

Next Steps

Weekly Goals

  1. Bigger cohort of data (MSc DataScience?)
  2. Explore time in Graph
  3. Data pipeline documentation and steps (anonymisation)
  • Project Management Project tasks - planning, admin.
  • Data:
  • Analysis / Wrangling:
  • Modeling:
  • Validation:
  • Deadlines:

Post-Meeting Notes

We met on 13 June 2024 for approximately 45 minutes. I showed Xiaodong what I have been up to referencing my working files, poc files, and some code. I also showed what I currently have in my free instance of neo4j aura - which was MSc DS students activities and rooms. Staff and Students to be loaded but I want to ensure my anonymisation function is tested first.

We discussed what my aims are with this project, clarifying that it is not building a timetable schedule based on graph structure; it is also not a timetable optimiser. Instead it is a data engineering project that ultimately explores whether representing timetables in graph format can bring opportunities for reporting and insight which is currently difficult to produce using the current system.

We agreed to meet in two weeks’ time. I will schedule a meeting for us.

Additional Notes

Summary from intial meeting

I met with Xiaodong Li my supervisor on Wednesday 01 May 2024 where we introduced ourselves and our backgrounds. We discussed my proposal which Xiaodong had read in advance of our meeting.

I showed Xiaodong my work so far, most of it completed in January which included proof-of-concept data engineering steps to extract, transform and load data from a relational database to a graph structure. I showed the steps I had taken, the challenges encountered and the possible opportunities of graph data structures which I am hoping to explore in more detail.

We discussed project scope and outcomes and recognised that I need to ensure that I keep within scope.

The next few weeks will require attention on other matters (work, taught modules, etc.) but I will look to pick up project work soon.

If possible, Xiaodong was going to investigate Neo4j and graph to get a bit of context.

Supervision